Description
CHAPTER 7 · LEANTPS™ BOOKS · PDF + EPUB · ONLINE READING
Just In Time
Coordinate work with demand through takt time, flow, pull, replenishment, and Heijunka. Use worked calculations and disruption studies to test the conditions that the proposed system requires.
Watch the chapter overview
Connect work with demand
Use takt time, flow, pull, and Heijunka as related operating disciplines.
Test the replenishment loop
Work through container quantities, lead time, buffers, and recovery conditions.
Respond to disruption
Distinguish an arithmetic proposal from demonstrated operating capability.
Read a few pages before you choose
Open the free sample to review the cover, contents, and selected reading pages.
Explore the chapter contents
Page numbers refer to this separate chapter PDF edition.
7.0 Just In Time Within the Management System · p. 4
7.1 Purpose, History, and the Meaning of Need · p. 7
7.2 Demand, Planning, and the Time Basis · p. 10
7.3 Takt Time, Observed Cycle, and Capacity · p. 14
7.4 Lead Time, Flow, and the Condition Between Processes · p. 19
7.5 Heijunka: Volume, Mix, and Feasible Leveling · p. 22
7.6 Release Control and the Point of Commitment · p. 26
7.7 Work in Process, Inventory, and Defined Limits · p. 30
7.8 Pull Relationships and the Meaning of a Signal · p. 34
7.9 Kanban: Instructions, Containers, and Status · p. 39
7.10 Designing a Replenishment Loop · p. 43
7.11 Small Lots, Changeovers, and Flexible Work · p. 47
7.12 Material Presentation, Transport, and Sequenced Supply · p. 50
7.13 Supplier Coordination and Shared Operating Conditions · p. 55
7.14 Jidoka Within the Flow Relationship · p. 59
7.15 Leadership Responsibility for Dependable Flow · p. 62
7.16 People, Capability, and the Usable Method · p. 65
7.17 Measures That Explain the Connection · p. 68
7.18 High Mix, Services, and Information Work · p. 72
7.19 Digital Systems, Automation, and Human Judgment · p. 75
7.20 Worked Study: Improving a Replenishment Loop · p. 78
7.21 Worked Study: Leveling a Mixed-Model Requirement · p. 83
7.22 Worked Study: Releasing Information Into Work · p. 87
7.23 Implementing and Sustaining a Defined Connection · p. 91
7.24 Worked Study Reviewing a Disrupted Replenishment Loop · p. 94
7.25 Chapter Review: Coordinating Need With Capable Execution · p. 99
Source Notes · p. 102
Your digital reading edition
102-page colour PDF plus a reflowable EPUB. Your purchase also includes online reading in the LeanTPS reader, with section navigation, adjustable text size, and day or night mode. Download the PDF for its fixed page layout or the EPUB for a compatible reading app. No physical book is shipped.
This purchase covers this chapter only. The complete book, Academy enrolment, certification, coaching, and teaching rights are separate.
David Devoe draws on Toyota Industries training in Takahama, 13 years at Toyota BT Raymond, core membership in the North American TPS working group, Jishuken, and training with Sadao “Sam” Nomura.
Independent publication by David Devoe. Not endorsed by Toyota.
Explore the chapters in order
Each chapter is available separately. The chapter you are viewing is marked in grey.
Prefer the complete book? Get all eight chapters in one book for CAD $39.99.

Chapter 7: Just In Time
You are viewing this chapter
2026 chapter extract. This chapter is sold separately and is drawn from Lean TPS: The Thinking People System – A System to Prevent Failure (2026 Edition), published by David Anthony Charles Devoe (LEAN TPS). Complete-book identifiers: PDF ISBN 978-1-0699261-1-1; EPUB ISBN 978-1-0699261-2-8. These ISBNs identify the complete book, not this separate chapter. Copyright © 2026 David Devoe. All rights reserved.











Reviews
There are no reviews yet.